A four-phase sequence built to eliminate the surprises that ruin construction projects. Same protocol on a kitchen remodel or a ground-up build.

Phase 01 / 04

Intake & Site Read

First call, site walk, and a real look at your drawings and existing conditions. We check the town’s code and permit path, flag anything structural or budget-breaking, and give you an honest go / no-go before anyone spends money.

Deliverables
  • On-site walk-through
  • Drawing & scope review
  • Existing-conditions report
  • Permit & zoning outlook
Phase 02 / 04

Scope Lock & GMP

Line-item takeoff. Subcontractor bids from our vetted Connecticut bench. Allowances written in plain English so you know exactly what’s in and what’s not. You get a locked GMP, a real schedule, and a procurement plan — not a napkin number.

Deliverables
  • Line-item GMP
  • Locked subcontractor bids
  • Procurement & long-lead schedule
  • Permit package submitted
Phase 03 / 04

Build

Boots on site. A dedicated superintendent runs the daily job, keeps the site clean, and stays your single point of contact. Weekly owner meeting, photo log, and a live budget + schedule you can actually read — no surprise invoices at the end of the month.

Deliverables
  • Dedicated site superintendent
  • Weekly owner meeting + photo log
  • Live budget & schedule portal
  • Change orders in writing, before work
Phase 04 / 04

Punch, Close-out & Warranty

Punch list driven to zero before we send the final invoice. Town sign-offs, as-builts, and a full O&M binder with every warranty. Twelve months later we come back and walk the job with you — anything on us gets fixed.

Deliverables
  • Punch to zero
  • Town sign-offs & CO
  • As-builts + O&M binder
  • 12-month workmanship warranty walk